Fire Station Belgrade Waterfront

Mechanical installations at the Fire Rescue Unit building, BLOCK 29D, Belgrade Waterfront – radiator heating, hot water heaters, substation–heat exchangers, circulation pumps, 40 kW electric boiler, VRV system, VRF system, SPLIT system, rooftop fan with air extraction flow 10,000 m³/h.

Client

Fire Station Belgrade Waterfront

Year

2023-2024