National Assembly of Serbia – Air Conditioning K3

Reconstruction of the AIR CONDITIONING system K3 installations (air conditioning, ventilation, heating, automation, electrical works, construction), circulation pumps, duct system for BIPOLAR AIR IONIZATION, AIR HANDLING UNIT with a flow of 10,800 m³/h; duct system for air purification with a flow of 10,800 m³/h.

Client

National Assembly of Serbia

Year

2024